The draft national budget for 2026–2028 under functional group 010 (“Agriculture, water management, forestry, fisheries, protected natural areas, environment, wildlife, and land relations”) shows a sharp shift in investment scale. In 2026, spending jumps to 698,997,761 thousand tenge, which is 231 billion tenge more than the approved budget for 2025 (467,846,427 thousand tenge). A year later, the amount drops again: 471,266,128 thousand tenge in 2027, and 453,355,861 thousand tenge in 2028. The spending trajectory resembles front-loading – the government injects most of the money in the first year, expecting the system to keep momentum afterward. But a key question remains: is the institutional capacity ready to absorb this funding?
In 2026, 353,750,000 thousand tenge will be allocated, which is four times more than in 2025 (87,826,100 thousand tenge).
Funds are intended for:
• subsidized working-capital loans for food processors,
• financing of livestock and aquaculture projects,
• investment project support.
In 2025, this mechanism showed measurable results:
• crop area covered by subsidized rates: 3,209 thousand hectares,
• loan guarantee coverage: 85% of principal,
• insured crop area: 307 thousand hectares,
• insured livestock: 1,096 thousand heads.
In 2026, the allocation increases dramatically, yet no efficiency indicators are defined. It is crucial that loans do not simply cover cash shortfalls – they must serve as a driver of modernization.
Total budget for 2026–2028: 448,561,430 thousand tenge,
with 157,231,009 thousand tenge already in 2026.
This is almost 44 billion tenge more than in 2025 (113,379,973 thousand tenge).
Planned outcomes:
• ensure uninterrupted operation of 227 water infrastructure sites,
• release 2,581 million cubic meters of ecological flows from reservoirs,
• implement 17 group water supply projects,
• build or rehabilitate 43 hydraulic facilities.
For comparison: in 2025, 195 sites were maintained and design documentation was prepared for 12 reservoirs. The scale is accelerating – but is there enough project readiness and contractor capacity to avoid delays?
Environmental spending also increases – results remain uncertain
2025: 13,420,867 thousand tenge
2026–2028: 66,104,086 thousand tenge, including 26,726,524 thousand tenge in 2027.
Goals include:
• reducing greenhouse gas emissions,
• environmental monitoring,
• implementing Best Available Technologies (BAT),
• managing hazardous waste.
Expected outcome indicators:
• satisfaction with environmental quality: 62.8% by 2028,
• share of regions implementing BAT: 87%.
But satisfaction depends on many factors outside the budget – clean air, urban environment, perception. An increase of just 3.6 percentage points over three years looks optimistic.
Forestry and wildlife protection
2026–2028 spending: 193,901,266 thousand tenge,
about 64.6 billion tenge annually.
Planned targets:
• forested land to increase from 13,889.6 thousand hectares in 2026 to 14,213 thousand hectares in 2028,
• material and technical equipment of environmental agencies to reach 100% in 2027.
In the 2025 budget, the focus was also on biodiversity: population growth – tugai deer +0.76%, kulan +0.95%.
Fisheries
8,508,386 thousand tenge allocated.
Target indicators:
• protect 67 valuable fish species,
• protect 18 rare and endangered species.
In 2025, the target was 52 valuable species. A jump to 67 requires stronger monitoring and control measures, which the budget does not specify.
Livestock development
114,901,122 thousand tenge allocated.
Plans include:
• 72 million animal health tests,
• purchase of 148 million doses of veterinary drugs,
• 193 million reference tests,
• 41 thousand food safety tests.
Coverage of especially dangerous diseases should reach 37.6% annually (2025 level – 36.2%). Spending grows, but results barely improve.
Crop production
56,623,241 thousand tenge allocated.
Target:
• maintain 100% coverage of chemical treatments against locusts and quarantine pests (every year).
Spending decreases from 17.5 billion tenge in 2026 to 15.2 billion in 2028, while required output stays the same → risk of underfunding.
Digitization of land data
45,571,327 thousand tenge allocated.
Targets:
• 100% digital mapping of land by 2026,
• cadastral data availability to increase from 47% (2026) to 53% (2028).
The workload is intense but achievable – unless there is a shortage of specialists.
Research and innovation
12,871,909 thousand tenge,
of which 10,903,445 thousand tenge is spent in 2026.
Goal:
• share of implemented scientific developments to increase from 22% (2025) to 31% (2028).
A nine-point increase is possible only if there is real market demand. The document does not explain how this will be ensured.
The budget structure makes sense: agriculture, water, and environment are strategic priorities. But the spending spike in 2026 outpaces actual execution capacity.
Critical risks:
• not enough project managers and specialists,
• potential loan defaults in AIC financing,
• pressure to “spend fast” may reduce project quality,
• environmental satisfaction depends more on reality than on budget lines.
If the government focuses only on process metrics – hectares, cubic meters, number of loans – the impact will be limited. If the focus shifts to outcomes – productivity, water quality, commercialization of research – then these billions can produce long-term results.
Alen Serik, expert of the portal EconomyKZ.org


