Long-term planning: key to sustainable infrastructure development

Large-scale and rapid construction of infrastructure, while useful for improving living conditions, also creates long-term risks. When many facilities are built or renovated at the same time, this leads to a future situation where major expenses will again accumulate in a single period. In such cases, the government loses the ability to spread costs evenly over several years.

During the 1960s–1980s, the entire Soviet Union (including the Kazakh SSR) saw massive construction across almost every sector. Standard design railway stations, schools, hospitals, and apartment blocks were built nearly simultaneously. For that era, this approach made sense: the post-war period created high demand, the “low base effect” was present, and population growth required quick solutions.

However, about fifty years later, all these buildings reached the end of their life cycle at the same time. Entire districts of panel houses suddenly require major repairs, hundreds of schools may need to be temporarily closed for reconstruction, and railway stations built in the 1960s–1970s become worn out simultaneously. This creates extremely high financial pressure – often requiring billions of tenge.

For example, Kazakhstan is currently renovating 125 railway stations almost at the same time. The work started this spring, and most stations are planned to be completed by the end of the year.

Yet many of these buildings were already overhauled just 10–15 years ago. There is no open data showing that most of them are in emergency condition. Only a few stations are being fully dismantled and rebuilt because expert assessments found real structural risks. At the same time, large projects often create an incentive to demonstrate scale – including in the use of public funds. This raises the risk of misjudging which facilities actually need renovation now.

As a result, a large-scale renovation program today will likely trigger another large-scale spending wave in the future – again within a short time frame. And this could coincide with periods of budget deficits.

Recommended Alternative Measures

1.⁠ ⁠Spread large construction and renovation programs over longer periods

This allows facilities to be commissioned – and later to wear out – in different years, rather than all at once.

2.⁠ ⁠Conduct independent technical assessments for each building

Before including an object in the program, evaluate its condition separately and prioritize facilities that truly require immediate intervention.

3.⁠ ⁠Ensure full public transparency for every object

Publish expert assessments, renovation costs, timelines, and justification for each decision.

4.⁠ ⁠Create a unified digital database of critical infrastructure facilities

Each object should have a digital passport including:

  • ⁠ ⁠technical condition and wear index;
  • ⁠ ⁠last repair and reconstruction dates;
  • ⁠ ⁠estimated lifespan of structural elements;
  • ⁠ ⁠short- and long-term repair plans;
  • ⁠ ⁠justification for inclusion in state programs.

5.⁠ ⁠Introduce long-term planning for infrastructure cycles

Break major projects into 10–20-year phases, distributing them by priority, wear level, and budget capacity. This helps avoid sudden spikes in spending and ensures a balanced budget load.

Daulet Zhambaybekov, independent expert, specifically for www.economyKZ.org