Kazakhstan’s draft national budget for 2026–2028 shows a clear shift in economic priorities: the state plans to invest more money into export promotion and industrial development. Spending under the functional group “Industry, architecture, urban planning and construction activities” will reach 30.8 billion tenge in 2026 – almost 80% higher than in 2025 (17.1 billion tenge). In 2027 and 2028, the spending drops back to around 12.9 billion and 13.0 billion tenge.
The government focuses on three areas:
1. promoting Kazakh-made goods in global markets,
2. developing industry and encouraging localization and digitalization,
3. improving urban planning and infrastructure data management.
The largest increase goes to export promotion. In 2026, 13.2 billion tenge is allocated for export support, and 29.6 billion tenge for the entire 2026–2028 period. The funds will support participation in international exhibitions, trade missions abroad, and an export acceleration program. In 2026, the program introduces a new tool – a multi-factor assessment of export potential, allowing the government to select companies that are truly ready to enter global markets. The expected outcome is 900 million USD in export contracts.
In 2025, export support totals 8.5 billion tenge. With this money, Kazakhstan plans to conduct ten trade missions (with expected contracts worth 500 million USD), take part in China’s major import fair (expected contracts: 150 million USD), and run an export acceleration program involving 120 companies (expected contracts: 400 million USD).
Spending increases by 55%, while the expected volume of contracts more than doubles. On paper, it looks efficient. But there is a problem: a signed contract is not the same as actual export. The budget does not track whether contracts are fulfilled, whether goods are delivered, or whether exports translate into tax revenue.
Industrial development receives 12.9 billion tenge in 2026, but starting from 2027 the amount sharply drops to only 2.26 billion tenge per year. This indicates a one-year spike, not a long-term plan. The funds support information systems related to local content (the “Kazakhstan Content” portal and GIS registry for goods and services in subsoil projects), as well as infrastructure development for special economic zones and industrial zones.
In 2025, support is provided through partial cost reimbursement: the government covers up to 40% of costs related to staff training, production modernization, efficiency improvement, and digitalization. However, the scale of this assistance is very small – only 64 companies are covered nationwide. The program is more symbolic than systemic.
Urban planning and architecture receive 2.58 billion tenge in 2026. This funding is aimed at a large inventory of underground and above-ground infrastructure – 227,000 hectares – and the development of a digital urban planning cadastre. This work focuses not on construction itself, but on collecting and digitizing infrastructure data. If used correctly, the data could reduce planning mistakes and cost overruns – but the budget does not define how economic benefits will be measured.
Compared with 2025, spending is increasing faster than measurable results. More money is being poured into export promotion, yet the results remain at the level of “expected contracts.” Industrial spending grows dramatically, but lacks long-term strategy and clear indicators of success – such as productivity gains, increased output, or tax contributions. The urban planning block has a visible target, yet the economic impact is not explained.
The core issue lies in KPI design. The state tracks activities, not outcomes. A signed contract is counted as a result, even if the export never materializes. Cost reimbursement is considered a success, even though no link is defined between reimbursement and improved performance of the company.
The budget does not answer the most important question: How much new economic value does the state receive for every tenge spent?
Without measurement, efficiency cannot be evaluated.
Kazakhstan is prioritizing exports and industrial development. This is necessary for economic diversification. But:
• spending grows rapidly while result metrics do not,
• no tracking exists to verify whether export contracts turn into real shipments,
• industrial support is temporary, not continuous,
• there is no calculation of return on investment.
For the budget to become an economic growth instrument, the state must fund results – not processes. If outcomes are not measured, money remains just spending – not investment.
Alen Serik, expert of the portal EconomyKZ.org


